The remodeling of the Main Street entrance is coming along roughly on schedule. As is the case with any remodel (versus a new build) there are almost certainly going to be some of those "Hmm...that's not on the drawings" moments. So far, we've really only had one major stumper as the flooring was peeled up across the seam between the northern-most addition and the older part of the building. That problem has been resolved, thankfully.
If you drive by now, you can see a glimpse of what the exterior will look like when it's done. The window frames are in both upstairs and down. Right now they are working on the un-glamorous but VERY necessary changes to the HVAC in that area.
|
Dust barrier inside the Main Street entrance - it worked great! |
|
North facing wall pre-window frames |
|
Sidewalk view pre-window frame |